Skip to content

eval on vthread check and memo ver check #234

eval on vthread check and memo ver check

eval on vthread check and memo ver check #234

Triggered via push September 19, 2025 17:44
Status Failure
Total duration 34s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

21 errors
test (ubuntu-latest, 8, 1.10.3)
Process completed with exit code 1.
test (ubuntu-latest, 17, 1.10.3)
Process completed with exit code 1.
test (ubuntu-latest, 17, 1.12.0)
Process completed with exit code 1.
test (ubuntu-latest, 11, 1.10.3)
The operation was canceled.
test (ubuntu-latest, 11, 1.10.3)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 11, 1.11.4)
The operation was canceled.
test (ubuntu-latest, 11, 1.11.4)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 17, 1.11.4)
The operation was canceled.
test (ubuntu-latest, 17, 1.11.4)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 8, 1.11.4)
The operation was canceled.
test (ubuntu-latest, 8, 1.11.4)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 8, 1.12.0)
The operation was canceled.
test (ubuntu-latest, 8, 1.12.0)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 11, 1.12.0)
The operation was canceled.
test (ubuntu-latest, 11, 1.12.0)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 21, 1.11.4)
The operation was canceled.
test (ubuntu-latest, 21, 1.11.4)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 21, 1.10.3)
The operation was canceled.
test (ubuntu-latest, 21, 1.10.3)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed
test (ubuntu-latest, 21, 1.12.0)
The operation was canceled.
test (ubuntu-latest, 21, 1.12.0)
The strategy configuration was canceled because "test.ubuntu-latest_8_1_10_3" failed